Seattle Municipal Tower

Client: Miller Hayashi Architects

Architect: Miller Hayashi Architects

Project Size: 78,000 sf (impacted floors only)

Services: 

  • Informing Design
  • WINDOW/OPTICS Analysis


The goal of this analysis was to evaluate the energy consumption and cost impacts of installing new glazing units as part of an overall retrofit of the sloped glazing system at the top of the Tower.  The process started with an intial site visit, review of as-built drawings, and confirming operational/HVAC assumptions with the building manager.  Using this information, a whole building energy model of the upper floors was created, including descriptions of VAV air distributions systems, central plant equipment, and daylighting controls.  Detailed simulation inputs for the existing and various new glazing options were generated using the WINDOW/OPTICS programs, and the impacts of each selection on HVAC and lighting energy consumption evaluated.