Quincy Wastewater Treatment Plant

Client: PACE Engineers
Project Size: 1 equipment building

Services

  • On-Site Performance Assessment
  • Energy Consumption Submetering
  • Measurement and Verification (M&V)

The Quincy Municipal Water Reclamation Facility receives and treats residential, commercial and industrial wastewater from the community and agricultural industries.  In response to recent increases in wastewater loading, the City of Quincy is seeking to increase capacity in the two sequencing batch reactors by installing a new, higher capacity aeration diffuser grid, and increasing blower output.


360 Analytics was engaged by PACE Engineers to perform an on-site energy audit, as well to assist in development and implementation of a measurement and verification (M&V) plan, including accounting for plant loading increases throughout the post-retrofit reporting period.